Projects / Absheron Peninsula Master Plan
ABSHERON · AZERBAIJAN
Preparation of Absheron Peninsula Master Plan
Water, wastewater, and stormwater master planning for a population equivalent of 4,000,000.
Project at a Glance
CountryAzerbaijan
Population Equivalent4,000,000
TypeMaster Plan & Feasibility
Our RoleDesign Subcontractor
Project Overview
Absheron Peninsula Master Plan
A comprehensive master plan for the water, wastewater, and stormwater systems of the Absheron Peninsula, covering a population equivalent of 4,000,000. HIDROGUNES worked as a design subcontractor on this work.
Scope of Work
- Prefeasibility and feasibility reports, data collection, and control
- Determination of population, water requirements, and wastewater flows and loads
- Planning of water resources, water treatment plants, and water distribution systems; water quality and water loss analyses
- Planning of the wastewater collection system and treatment plants, sludge management, odor control, and water recovery
- Stormwater collection and stream systems, flood management, environmental impacts, climate change and drought, GIS, energy management, investment and financing, and institutional studies